Skip to main content
422105 01 N7 jpg

Minute Maid Park

Client
Astros
Location
Houston, Texas
What we did
Size
1,263,240-SF Stadium – Existing Building

Page provided Testing, Adjusting, Balancing (TAB) and Retro-commissioning services for the Astros’ Minute Maid Park, optimizing airflow performance throughout the stadium. The project included balancing the stadium bowl and Club Level to restore proper air distribution and occupant comfort. 

Given the stadium’s size and varying occupancy loads, Page identified equipment that needed repairs or recalibration to restore system functionality. Retro-commissioning uncovered aging or misaligned components impacting performance, such as dampers, fans, and controls. These deficiencies were documented in an Issues Log, prioritizing necessary repairs and adjustments. 

Identifying these issues was essential for effectively completing the TAB process. This integrated approach ensured accurate system balancing and extended the lifespan of critical HVAC components, improving energy efficiency and overall operational reliability.

Similar projects

  • Image 16 1
    case study
  • 421109 jpg
    case study
  • DYA007 N3 jpg 1
    case study
  • 419193 N61 jpg
    case study

/

1014063 01 N191 Retouched

Talk with us

Complex challenges need fresh perspectives and deep expertise. Connect with our team to explore how we can help you create spaces that make a real difference.