Skip to main content
415034 N11 medium

Central Plant Renovations

Client
Harris Health
Location
Houston, Texas
What we did
MEP Engineering, Architecture
Size
17,450-SF Renovation

Ben Taub General Hospital plays a critical role in regional healthcare, being one of only two Level One trauma centers serving 5 million residents across Houston and Harris County.  To enhance efficiency and resilience, Page designed the hospital’s transition to the TECO district energy network, a system powering 16 institutions across the Texas Medical Center.

Ensuring zero disruptions, our team developed a phased execution strategy to install 20-inch chilled water and 6-inch steam piping while avoiding costly shutdowns or temporary rentals. Utilities were extended from the TECO vault to the Physical Plant Building, integrating seamlessly with hospital systems. After precision cleaning and flushing, steam and condensate systems were brought online, followed by chilled water.

To further enhance mechanical performance, Page’s engineers reimagined thermal piping sequences, cutting commissioning phases from 9 to 2 and streamlining deployment. Leveraging advanced 3D modeling, the team optimized the system layout for maximum efficiency without unnecessary overbuilding. At the same time, the hospital’s backup power system was rebalanced, remapping electrical panels to automatic transfer switches for prioritized load sequencing during outages.

A first-of-its-kind innovation in the Texas Medical Center, the new backup power system allows load banks and roll-up generators to parallel with on-premises generators—without extra equipment or complex modifications. This system provides continuous operation, even in emergencies.

With new codes requiring 30 inches of flood protection, Page partnered with subconsultants to develop a future-proof resilience strategy, fortifying the utility plant against evolving climate challenges. The result is a smarter, more adaptable infrastructure—engineered for reliability and the demands of modern healthcare.

Similar projects

  • 411998 N3 medium
    case study
  • Exterior
    case study
  • 412031 N3 medium
    case study
  • 418079 N4 jpg
    case study

/

1014063 01 N191 Retouched

Talk with us

Complex challenges need fresh perspectives and deep expertise. Connect with our team to explore how we can help you create spaces that make a real difference.