Skip to main content
721064 N11 jpg

Civil Engineer and Logistics Readiness Squadron Complexes

Client
U.S. Army Corps of Engineers, Mobile District
Location
Tyndall Air Force Base, Florida
What we did
MEP Engineering, Fire Protection Engineering, Sustainability, Master Planning, Construction Administration..., Landscape Architecture, Architecture, Interior Design, ICT Engineering
Certifications
Designing to Guiding Principles
Size
210,500-SF New Construction

Settled on the U.S. Gulf Coast—surrounded by tidal marshes, sandy beaches, and estuaries—lies Tyndall Air Force Base, an extensive training and testing center that optimizes mission readiness. In 2018, Hurricane Michael’s eye made landfall on the base with winds up to 155 MPH, causing significant destruction to the site.

As part of “Installation of the Future,” the roadmap for rebuilding Tyndall, the base is constructing more than 100 buildings, including the Civil Engineer (CE) and Logistics Readiness Squadron (LRS) complexes. With a heightened focus on resilience, Page’s designs are a triumph of form and function, meticulously crafted to withstand nature’s harshest tests.

A crucial hub of adaptability and support for Tyndall, the CE and LRS complexes are instrumental to base preparedness and operational effectiveness. As the CE squadron oversees the operation, maintenance, repair, and construction of Tyndall’s infrastructure, all 10 facilities exude a sense of strategic vision.

721064 N4 jpg

Civil Engineer Squadron Complex

Promoting wellness, the CE headquarters features an expansive rooftop terrace, an elevated sanctuary where stress is replaced by serenity, camaraderie is forged, and inspiration finds wings. Outfitted with the latest software and tools, it’s a hub of creativity and decision-making, while conference rooms and collaboration spaces enhance communication between squadrons.

721064 N7 jpg
Logistics Readiness Squadron Complex

The LRS headquarters, with administrative and office space for leadership, serves as the squadron’s nerve center. Designed by Page to promote easy interactions and visibility among participants, conference rooms set the scene for a cascade of decisions.

A carefully planned layout, enhanced by strategic lighting and balanced color schemes, creates an atmosphere conducive to sensitive conversations. The building also includes highly secure areas reinforced with advanced telecommunications and building systems to safeguard critical operations.

Support buildings deliver needed services and campus cohesion
721064 N6 jpg

The vehicle operations and maintenance facilities feature advanced tools and technology, while diagnostic systems stand ready to service vehicles. Here, the hum of machinery blends with the lively conversations of troops working to install equipment upgrades, repair machinery, and troubleshoot issues so vehicles are in optimal condition. Mechanical and electrical systems, tailored for efficiency, support the demanding pace of this high-performance workspace.

A meticulously organized warehouse building houses supplies, equipment, and spare parts. A cargo staging area features a roller shutter door, allowing supply vehicles access and expediting pickup and delivery.

Like the rest of the complexes, buildings are characterized by light, neutral, and metallic materials to contribute to a cohesive campus feel, while paths, signage, and lighting create a more pedestrian-friendly complex.

721064 N3 jpg

Similar projects

  • Exterior
    case study
  • 721033 jpg
    case study
  • 2017093 01 N25 medium
    case study
  • 2 P16029 01 N7 medium
    case study

/

1014063 01 N191 Retouched

Talk with us

Complex challenges need fresh perspectives and deep expertise. Connect with our team to explore how we can help you create spaces that make a real difference.