The Palace Theatre Master Plan, Restoration, and Renovation

Client
Albany Local Development Corporation
Location
Albany, New York
What we did
Master Planning, Modernization & Preservation
Size
2,800-seat theatre

Constructed in 1931 and listed on the National Register of Historic Places in 1979, this restored RKO theatre is a vibrant cornerstone of Albany’s arts and entertainment scene. Guided by the Historic Structure Report Page completed in the 1980s, we carried out the renovation and restoration in two phases, working within tight timelines during the theatre’s off-seasons.

1002036 00 N131 medium

Phase One

A timeless revival – blending historic elegance with contemporary performance

Phase One included restoring the building envelope and architectural elements, plus an interior refresh with new carpeting, stage curtains, and fabric wall treatments. The original decorative ceiling finishes, hidden under cocoa-brown paint, were uncovered to reveal historic murals. The theatre’s damaged ornamental plaster was meticulously repaired, reviving its gilding, glazing, stenciling, and vibrant painting. The 2,800 seats, designed by famed movie palace architect John Eberson, were restored to their former grandeur. Matching fabrics and draperies were replaced with designs inspired by the originals.

MEP systems were also upgraded to meet the theatre’s needs. At the time of the restoration, the facility still used one of the first dimming racks built by General Electric. Page replaced this outdated system and upgraded lighting fixtures, control consoles, and power distribution.

Step back in time: Once a bustling movie palace, The Palace Theatre has been rejuvenated as a prime venue for musicals, plays, concerts, and comedians in New York state’s capital.

1002036 00 N134 medium

A backstage built for bold performances

Expanding the theatre’s performance offerings, the stage was deepened to accommodate first-run Broadway shows. The backstage also received upgrades, including new dressing rooms, an elevator, loading areas, and additional storage and rehearsal space.

1002036 00 N10 medium

Timeless performance

Phase Two renovations included improvements to the front and back of the house, resulting in a larger lobby, donor room, expanded concession area, and a newly positioned box office. Most notable, a new energy-efficient, full-color replica of the 1931 marquee was installed, with costs covered by a NYSERDA grant.

From integrating technology to creating focal points with space and lighting, Matt Chalifoux and John Myers explore the shared spotlight between courtrooms and traditional theatrical spaces.

Listen to The Good Courtroom
1002036 00 N44 medium

Similar projects

  • 12 AK 230120 7665 1
    case study
  • G073000 01 N40 jpg
    case study
  • 20 DB20313 00 N14 jpg
    case study
  • 20 DB21219 00 N2 jpg
    case study

/

1014063 01 N191 Retouched

Talk with us

Complex challenges need fresh perspectives and deep expertise. Connect with our team to explore how we can help you create spaces that make a real difference.